p4newstreet logo

A while ago I shared my initial thoughts on extending Brettell Road.  For those that missed it click here.

The initial plan required some modification to the Left hand end of the existing layout but otherwise it was pretty much an add on.  Then the coronavirus happened and while plans were firmed up no wood was cut (lazered) and its not progressed to any kind of physical reality.  In that time my thoughts have turned to correcting the first regret, that being that Brettell Road 1 wasn’t double track to begin with.  This would also have the benefit of replacing the mainline track bed with ply as initially I used MDF.  The layout was only supposed to be a play thing if you remember.

This would require some additional tweaks to Brettell Road 1 but actually not as drastic as one might think.

Starting with the left hand end, where the new boards would attach to the existing layout in addition to the track.  I was actually quite generous with the track spacing and the double track would fit with only a slight tweak to the wall shown by the arrow. There’s another advantage here as my first plan would involve splitting the single slip across the baseboard joint but the double track pulls everything further in to the layout meaning the entire slip falls on this board. No changes would be required to the bridges.

At the right hand end there’s a benefit to slewing the track away from the front of the layout with space then for the second track in front of it.  The plan is to extend the furthest siding a little while shortening the front one a smidge.  This would allow me to start curving the front wall just after the canal bridge to generate the extra space.  I will need to build a new bridge. None of these tweaks are particularly drastic.

Below is a mock up of how it would look.

Subscribe
Notify of
guest

This site uses Akismet to reduce spam. Learn how your comment data is processed.

0 Comments
Inline Feedbacks
View all comments