Work has progressed on my warehouse. Starting with bedding in the building and adding the now familiar neglected feel to the end of the sidings. Just need a light airbrush of general gunk colour to tie it all together. I’ve installed the second floor which means the final lighting for the first floor is also in place. I used self adhesive copper tape instead of wire and found it made things so much easier. Something ill definitely be adopting for the other floors and buildings
Finally a couple of pics of the Deeley tank parked up for the night.
A super set of photos, I particularly like the last one.