All of the track that crosses between boards 1 and 2 is now down. This means that board 1 can go into storage for a while and track laying can continue onto board 2.
As with all things often tweaks need to be made when you see things full size and the roads over this part of the station are not quite right. Altering these does not affect the work done so far.
Recent Comments